8m×4m×2m预制箱涵设计存在问题及改进措施 被引量:1

INAPPROPRIATE PROBLEMS AND IMPROVEMENT MEASURES FOR THE DESIGN OF 8M×4M×2M PREFABRICATED BOX CULVERT
下载PDF
导出
摘要 针对辽东湾新区预制箱涵由卧式生产改为立式生产后,及原设计中存在若干问题,如吊环改为吊孔,承插口相对位置,遇水膨胀胶圈断面改进,手孔加长,标准型模具生产非标准型箱涵等问题,采取对应技术措施,取得了安全、合理、经济效果。经生产安装后证明这些措施是完全正确有效,可在类事的工程中推广应用。 In view of the prefabricated box culvert in Liaodong Bay New Area has been changed from horizontal production to vertical production and the problems existing in the original design,such as the change of suspension ring to suspension hole,the relative position of socket ,the improvement of water expansion rubber ring section,the lengthening of handing hole and the production of non-standard box culvert in standard mould,the corresponding technical measures are adopted,and the safety,rationality and econcmic results are achieved.After production and installation,it is proved that these measures are completely correct and effective,and can be popularized and applied in similar projects.
作者 朱晓明 袁明新 韩晓涛 杨海荣 赵明界 王先进 ZHU Xiaoming;YUAN Mingxin;HAN Xiaotao;YANG Hairong;ZHAO Mingjie;WANG Xianjin(Liaoning Yangshui Hydraulic Cement Products Group Co.,Ltd.,Liaoning Liaoyang 111000,China;Liaoning Dalian Chengming Cement Products Co.,Ltd.,Liaoning Dalian 116100,China)
出处 《低温建筑技术》 2019年第9期80-83,共4页 Low Temperature Architecture Technology
关键词 辽东湾新区 预制箱涵 设计 改进措施 Liaodong Bay New Area prefabricated boxculvert design improvement measures
  • 相关文献

同被引文献14

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部