泉州湾跨海大桥70m短节段预制箱梁拼装施工技术 被引量:4

Assembly Construction Technology of 70m Short Segment Prefabricated Box Girder of Quanzhou Bay Sea-Crossing Bridge
下载PDF
导出
摘要 介绍了泉州湾跨海大桥深水区引桥70m短节段预制箱梁拼装施工工艺。施工中通过采取一系列拼装线形控制措施,提高了梁片预制精度和拼装线形,很好的保证了拼装架设质量。 The assembling construction technology of 70 m short segment prefabricated box girder of approach bridge in deep water area of Quanzhou Bay Sea-Crossing Bridge is introduced. In construction, a series of alignment control measures are adopted to improve the beam prefabrication accuracy and alignment, which ensures the quality of assembly and erection.
作者 林杰珍 Lin Jiezhen(Quanzhou Traffic Engineering Planning and Construction Administration Office,Quanzhou,Fujian 362000)
出处 《江西建材》 2019年第9期156-157,共2页 Jiangxi Building Materials
关键词 节段箱梁 短线匹配法 施工技术 Segmental box girder Short-line matching method Construction technology