摘要
某中心MALL美术馆六层及屋面层原设计为预应力混凝土结构,考虑到施工难度及工程进展,提前进行了结构形式,将预应力混凝土结构变更为钢结构,对变更后的钢结构吊装的施工关键技术进行了研究。
The six-storey and roof of MALL Art Museum of a certain center were designed as pre-stressed concrete structure. Considering the difficulty of construction and the progress of engineering, the pre-stressed concrete structure was changed into steel structure in advance. The key construction technology of hoisting of the altered steel structure was studied.
出处
《江西建材》
2019年第9期188-189,共2页
Jiangxi Building Materials
关键词
箱型钢
H型钢
胎架
卷扬滑轮组
吊装
Box section steel
H section steel
Frame
Hoisting pulley group
Hoisting