摘要
With the acceleration of urbanization and increase of points in power systems,complaints about power grids have increased.In the actual on-site measurement process,although the actual measurement results can meet the relevant standards,some people are still concerned that the electromagnetic environment may change drastically outside the measurement period,which will have an impact on human health.In this study,the situation of electromagnetic online monitoring systems at home and abroad was introduced firstly,and then some practical requirements for establishing monitoring stations were analyzed.According to existing technologies and related writings,the methods and steps for establishing a quality assurance system were introduced,including the identification of quality assurance system activities and their corresponding structure of quality assurance system documents,the preparation and principles of the documents,and the operation of the quality assurance system.It intends to provide reference for the relevant organizations and personnel conducting electromagnetic environment monitoring when establishing a quality assurance system.Through the establishment of the online monitoring system and the later data publicity,the public have an intuitive understanding of the electromagnetic environment attenuation around power transmission and transformation projects,which can not only make China's electric power industry develop better,but also monitor the unexpected situation in time,maintain public safety and reduce people's fear of electromagnetic radiation in substations.
With the acceleration of urbanization and increase of points in power systems,complaints about power grids have increased. In the actual on-site measurement process,although the actual measurement results can meet the relevant standards,some people are still concerned that the electromagnetic environment may change drastically outside the measurement period,which will have an impact on human health. In this study,the situation of electromagnetic online monitoring systems at home and abroad was introduced firstly,and then some practical requirements for establishing monitoring stations were analyzed. According to existing technologies and related writings,the methods and steps for establishing a quality assurance system were introduced,including the identification of quality assurance system activities and their corresponding structure of quality assurance system documents,the preparation and principles of the documents,and the operation of the quality assurance system. It intends to provide reference for the relevant organizations and personnel conducting electromagnetic environment monitoring when establishing a quality assurance system. Through the establishment of the online monitoring system and the later data publicity,the public have an intuitive understanding of the electromagnetic environment attenuation around power transmission and transformation projects,which can not only make China’s electric power industry develop better,but also monitor the unexpected situation in time,maintain public safety and reduce people’s fear of electromagnetic radiation in substations.
基金
Supported by the Open Project of Jiangsu Key Laboratory of Environmental Engineering(ZX2017005)