北京新机场金属屋面防渗漏技术综述 被引量:4

Comprehensive View of Leak Prevention Technology of Metal Roofs in Beijing New Airport
下载PDF
导出
摘要 北京新机场金属屋面工程实施过程中,严格依据质量管理程序,在计划组织、设计和施工、检验和验收、总结和售后维保等4个项目阶段,分别从人、料、机、法、环(4M1E)各个维度出发,针对所涉及防水功能的影响因素和风险,做出全面部署,采取完善管控措施,全面提高了金属屋面系统的防渗漏能力,最终实现了屋面系统防渗漏总体目标。 In course of construction of metal roofs of Beijing New Airport,the quality management regulations is strictly conducted covering all phases in planning,design and application,inspection and acceptance,summary and after sale maintenance.Starting from the dimensions of people,materials,machines,law and ring(4M1E),all factors affecting waterproofing performance and risks are considered and relative measures are taken,therefore performance of preventing leakage of the roofs is greatly improved,and finally achieved the overall goal of roofing system anti-leakage.
作者 刘宝辉 Liu Baohui(Center International Group Co.Ltd.,Beijing 100176,China)
出处 《中国建筑防水》 2019年第10期19-24,共6页 China Building Waterproofing
关键词 金属屋面 防渗漏 全面质量管理 4M1E metal roof leak prevention total quality management 4M1E
  • 相关文献

同被引文献12

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部