紧邻轨交站基坑的深基坑同步施工技术研究 被引量:2

Research on Synchronized Construction Technology of Deep Foundation Pit Adjacent to Rail Transit Station Foundation Pit
下载PDF
导出
摘要 结合上海市档案馆新馆(一期)工程深基坑与相邻轨交车站深基坑同步施工的实际,对两基坑同步施工的关键技术进行了研究。通过采用钻孔灌注桩结合三轴水泥土搅拌墙作围护、进行合理降水与分区开挖的方法,实现了两基坑同步施工的目标,确保了工程安全和施工进度。其经验可供类似工程参考。 According to the practice of synchronous construction of deep foundation pit of Shanghai Archives New Museum (Phase I) project and adjacent rail transit stations, the ley technology of synchronous construction of the two foundation pits is studied. By adoption of bored cast-in-place piles combined with triaxial cement-soil mixing wall as foundation pit support, and by methods of rational dewatering and partitioned excavation, the goal of synchronous construction of the two foundation pits is achieved, and the engineering safety and construction progress are ensured, which can be used as a reference for similar projects.
作者 马志磊 MA Zhilei(Shanghai Construction No.2 (Group) Co., Ltd., Shanghai 200080, China;Shanghai Engineering Research Center of Top-Down Method in Construction Engineering, Shanghai 200080, China)
出处 《建筑施工》 2019年第9期1613-1615,1622,共4页 Building Construction
关键词 深基坑施工 轨交车站 同步施工 基坑监测 deep foundation pit construction rail transit station synchronized construction foundation pit monitoring
  • 相关文献

参考文献4

二级参考文献14

共引文献104

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部