摘要 现有地铁施工多通过注浆法加固前方土体以达到控制变形的目的,但对掌子面前方的围岩变形难以测量,注浆对前方土体的效果则更加难以预测。为此,通过室内试验模型,模拟不同注浆效果下的隧道开挖掌子面前方围岩的受力状态及变形,并结合工程实际,特别研究了浅埋黄土隧道掌子面前方围岩变形规律与影响范围。 The existing subway construction mostly uses grouting method to reinforce the front soil to achieve the purpose of controlling deformation, but the deformation of surrounding rock in front of the tunnel face is difficult to measure, and the effect of grouting on the front soil is more difficult to predict. Therefore, through laboratory test model, the stress state and deformation of surrounding rock in front of tunnel excavation face under different grouting effects are simulated. Combining with engineering practice, the deformation gauge and influence range of surrounding rock in front of shallow loess tunnel face are studied in particular.
作者 芦孔娜 LU Kongna(China Railway Eighteen Bureau Group Fourth Engineering Co., Ltd., Tianjin 300350, China)
出处 《建筑施工》 2019年第9期1745-1747,共3页 Building Construction
关键词 地铁隧道 围岩变形 注浆法加固 施工控制 metro tunnel surrounding rock deformation grouting reinforcement construction control
  • 相关文献

参考文献4

二级参考文献35

共引文献44

同被引文献9

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部