公安长江大桥主塔上横梁施工技术 被引量:3

Construction Techniques for Upper Cross Girder of Pylons of the Gong’an Yangtze River Bridge
下载PDF
导出
摘要 公安长江大桥主塔为H型塔,主塔塔柱采用爬模施工,上横梁采用支架塔梁异步现浇施工,横梁支架为桁架式结构,桁架两端支承于主塔内侧面预装的钢牛腿上,主塔上横梁体积大。由于支架位于高空,支架安装、预压难度大、风险高,采用地面自平衡加载模拟预压,然后塔吊单片整体吊装桁架安装,变高空作业为地面作业,既能实测支架承载后变形量,又能检验支架的实际承载能力,安全性好,是一种非常规情况下支架预压和横梁施工较为经济、合理的方案。 The pylons of the Gong’an Yangtse River Bridge with "H" shape pylons were constructed by the climbing shuttering. The structure of the cross girder support is truss and the two ends of the truss are supported on the steel bracket which is pre-installed on the side of the py-lons. Because the volume of upper cross girder is huge and the support is heavy, it is difficult and risky to install and preloading. Self-balancing method is used to simulate preloading on the ground. Then installing the truss one by one by the tower crane turns install construction in the high into on ground. It not only can measure the deformation of the support after bearing, but also can verify the actual carrying capacity of the bracket because it's an economic and reasonable scheme under unconventional conditions.
作者 赵成贵 ZHAO Chenggui
出处 《上海公路》 2019年第3期41-45,M0003,共6页 Shanghai Highways
关键词 主塔 上横梁 桁架 自平衡 预压 施工 方案 pylons upper cross girder truss self-balancing preloading construction scheme
  • 相关文献

参考文献4

二级参考文献29

  • 1高培成,佘巧宁.武汉二七长江大桥中主塔墩基础围堰施工技术[J].桥梁建设,2010,40(2):1-4. 被引量:21
  • 2向学建,孙宪魁,杨昀,齐铁东.果子沟大桥桥塔施工过程的模拟分析[J].桥梁建设,2010,40(2):69-72. 被引量:26
  • 3GB50010--2010混凝土结构设计规范[S].
  • 4GB50017-2003.钢结构设计规范[S].[S].,..
  • 5JTG F80/1-2004,公路工程质量检验评定标准(土建工程)[S].
  • 6中铁大桥勘测设计院有限公司.黄冈公铁两用长江大桥施工图[Z].武汉:2010.
  • 7JTJ/TF50-2011,公路桥涵施工技术规范[S].
  • 8中铁大桥勘测设计院有限公司.新建铁路武汉至黄冈城际铁路黄冈公铁两用长江大桥主塔施工图[Z].武汉:2010.
  • 9GBT50621--2010钢结构现场检测技术标准[s].
  • 10胡汉舟,刘自明,秦顺全.武汉天兴洲公铁两用长江大桥斜拉桥技术总结[M].北京:北京中国铁道出版社,2009.

共引文献52

同被引文献25

引证文献3

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部