摘要
本文主要论述了在焦炉炉墙修补过程中的实际施工步骤,通过对焦炉炭化室进行控温降温操作,最终达到施工要求。在对76号炭化室炉墙修补后,有效解决了制约生产的难题,延长了焦炉的使用寿命,同时为今后的工作积累了宝贵经验。
The actual construction steps in the repair process of the coke oven wall was discussed. Through the carbonization chamber of the coke oven, the temperature control and temperature reduction operation was carried out, and finally the construction requirements were met. After repairing the furnace wall of No.76 carbonization chamber, it effectively solved the problem of restricting production, prolonged the service life of the coke oven, and accumulated valuable experience for future work.
作者
李大伟
Li Dawei(Jizhong Energy Fengfeng Group Corporation Ltd., Handan 056107, China)
出处
《煤炭与化工》
CAS
2019年第9期111-114,共4页
Coal and Chemical Industry
关键词
炉墙
控温
降温
挖补
陶瓷焊补
furnace wall
temperature control
cooling
digging
ceramic welding