摘要
在高速公路建设过程中,不可避免的会遇到跨越铁路、公路等既有结构物。本文结合保阜高速上岛大桥(跨越G207国道既有道路)预制T梁安装施工技术进行总结,为相关类似工程施工提高参考。
in the process of highway construction, it is inevitable to encounter existing structures such as railway and highway. This paper summarizes the installation and construction technology of precast T beam of Huangpu bridge (spanning the existing road of G207 national highway) in the west Fubaoding section of Taihang mountain expressway, which is a reference for the construction of similar projects.
作者
王明月
Wang mingyue(CSCEC Road bridge group co. LTD.,Hebei Shijiazhuang)
出处
《石家庄铁路职业技术学院学报》
2019年第3期26-29,共4页
Journal of Shijiazhuang Institute of Railway Technology
关键词
跨越
既有结构物
T梁安装
技术
spanning
existing structures
T beam installation
technology