期刊文献+

白鹤滩水电站建设质量管理实践 被引量:3

Quality management in construction of Baihetan Hydropower Station
下载PDF
导出
摘要 白鹤滩水电站工程建设环境复杂、建设周期长、工程技术难度高、施工不确定因素多、质量控制难度大,针对这些问题,白鹤滩工程建设部遵循“规范、有序、协调、健康”的管理要求,以最高的标准、最优的工艺、最严的管控,实施“零质量缺陷、零质量事故”的目标管理,建立了全面质量管理体系,有效防范了重大质量风险,确保工程建设质量受控。 There are some challenges faced by the construction of Baihetan Hydropower Station,such as complexity of construction environment,long construction period,complicated engineering technologies,uncertainty factors and higher requirement related to quality control.In accordance with the requirements of keeping operation in normative,orderly and coordinated and healthy ways,Baihetan construction department sets up a total quality management system,namely“zero quality defects,zero quality incident”,so as to ensure quality of project construction by controlling risks.
作者 龚子桢 蔡振峰 李玲 王玲玲 Gong Zizhen;Cai Zhenfeng;Li Ling;Wang Lingling
出处 《中国水利》 2019年第18期18-19,22,共3页 China Water Resources
关键词 白鹤滩水电站 质量管理 工程实践 Baihetan Hydropower Station quality management engineering practices
  • 相关文献

同被引文献13

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部