白鹤滩水电站高温季节温控混凝土生产质量控制 被引量:4

Quality control in concrete production for temperature control of Baihetan Dam in the season of high temperature
下载PDF
导出
摘要 通过对白鹤滩水电站三滩拌和系统预冷混凝土质量控制的分析,从生产环境、制冷系统设备配置选型及运行、混凝土配比组分以及相关管理措施等角度,着重分析了混凝土生产使用控制环节的管理,并结合生产实际提出一系列建议和意见。同时,对预冷混凝土生产全过程、全环境进行深入研究,为大型混凝土生产系统和大体积混凝土生产质量控制积累经验。 Based on the analysis of the quality control of pre-cooling concrete in Santan mixing system of Baihetan Hydropower Station,this paper analyses the production environment,the selection and operation of refrigeration system equipment,the composition of concrete mixing and related management measures.This paper focuses on the management of concrete production and use control links,and puts forward a series of suggestions and opinions combined with production practice.At the same time,the whole process and environment of pre-cooling concrete production are deeply explored to achieve the effect of reliable operation and in-place management,accumulate experience for large-scale concrete production system and mass concrete production quality control,and provide useful reference for quality management of similar or scale systems.
作者 杨维 张俊鹏 朱亚鹏 Yang Wei;Zhang Junpeng;Zhu Yapeng
出处 《中国水利》 2019年第18期42-44,共3页 China Water Resources
关键词 白鹤滩水电站 高温季节 混凝土 质量控制 Baihetan Hydropower Station high temperature season concrete quality control
  • 相关文献

同被引文献14

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部