数据化在水电站施工管理中的应用探索 被引量:1

Application of Digitization in Construction Management of Hydropower Station
下载PDF
导出
摘要 随着互联网技术的快速发展,结合计算机和信息技术,大数据充分发挥了对产业升级的引领作用。由于水电工程一般位于较为偏僻的河谷间,受施工环境限制,信息闭塞,施工过程中产生的海量数据无法得到有效积累,造成了信息资源的浪费。作者从施工现场实际情况出发,对在施工过程中产生的数据及收集方式等进行探索,并加以分析利用,帮助项目及企业提高信息化水平,从而提高施工管理水平,降低施工成本。 With the rapid development of Internet technology,combined with computer and information technology,big data has fully played a leading role in industrial upgrading.Because hydropower projects are generally located in relatively remote river valleys,limited by the construction environment,information is blocked,and the massive data generated during the construction process cannot be effectively accumulated,resulting in waste of information resources.Based on the actual situation of the construction site,the author explores the data and collection methods generated during the construction process,and analyzes and uses them to help the project and enterprises improve the level of informationization,thereby improving the construction management level and reducing construction costs.
作者 赵凯 张晓峰 袁在 ZHAO Kai;ZHANG Xiao-feng;YUAN Zai(PowerChina Sinohydro Bureau 10 Co.,Ltd.,Chengdu 610072,China)
出处 《价值工程》 2019年第30期66-67,共2页 Value Engineering
关键词 数据 统计 成本管理 成本控制 data statistics cost management cost control
  • 相关文献

参考文献1

二级参考文献7

共引文献6

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部