硬质岩倾填石地层及嵌岩咬合桩施工关键技术研究 被引量:3

Research on Key Technology of Hard Rock Tilting Stone Stratum and Rock-socketed Bite Pile Construction
下载PDF
导出
摘要 在硬质倾填石及基岩表面参差不平地层施工咬合桩时,常规套管钻机穿透填石层困难,且难以切削硬质基岩,荤桩入岩成孔时极易出现相邻素桩“管涌”,故常规全套筒跟进“湿咬”咬合桩难以实施。通过对深圳地铁6号线翰林站基坑防护咬合桩进行技术研究及科研创新,提出了硬质填石地层嵌岩咬合桩“干咬”成桩法,并研究、总结了施工中的各项参数、方法及关键技术,为以后类似工程施工提供依据和参考。 Conventional casing drilling rigs are difficult to penetrate the rockfill layer and difficult to cut hard bedrock when constructing bite piles on hard tilting rock and bedrock surface unevenness.When the piles are inserted into the rock to form hole,the adjacent plain piles are"pipebed",so the conventional full sleeve follow-up"wet bite"bite pile is difficult to implement.Through the technical research and scientific innovation on the foundation pit protection pile of Hanlin Station of Shenzhen Metro Line 6,the"dry bite"pile method of rock-embedded pile in hard rock-filled stratum is proposed,and the parameters,methods and key technologies in the construction are studied and summarized,which provide basis and reference for similar engineering construction.
作者 刘双武 LIU Shuang-wu(China Railway Seventh Group Co.,Ltd.,Zhengzhou 450016,China)
出处 《价值工程》 2019年第30期163-165,共3页 Value Engineering
关键词 地铁车站防护 咬合桩 花岗岩 干咬 施工参数 subway station protection bite pile granite dry bite construction parameters
  • 相关文献

二级参考文献12

共引文献23

同被引文献20

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部