地下锚杆清除施工方法探讨 被引量:1

Discussion on Construction Method of Underground Anchor Removal
下载PDF
导出
摘要 针对基坑支护施工过程中出现的周边已建建筑物的支护锚杆的清障要求,提出两种拟采用的清障施工方法即全套管全回转钻机清障和三轴深搅机清障,通过经济、技术、工期等多方面比较,最终确定采用三轴深搅机进行清障,并在后期施工实践中取得了较好的效果。 Aiming at the requirement of anchor rod clearance of surrounding built buildings during foundation pit support construction,two kinds of barrier clearance construction methods are proposed,i.e. full casing rotary drilling rig and three-axis deep mixer,through comparison of economy,technology and construction period,three-axis deep mixer is finally adopted to clear the barrier,which has achieved good results in the later construction practice.
作者 唐立飞 韩寿兵 TANG Lifei;HAN Shoubing(Jiangsu Tongzhou Foundation Engineering Co.,Ltd.,Huaian Jiangsu 223001,China;Jiangsu Huaiyin Business School,Huaian Jiangsu 223005,China)
出处 《工程质量》 2019年第10期57-61,66,共6页 Construction Quality
关键词 已建建筑物 基坑支护 全套管全回转钻机清障 三轴深搅机清障 方案比较 existing buildings foundation pit support troubleshooting of full-casing rotary drilling rig troubleshooting of three-axis deep mixer scheme comparisonechnical Scope
  • 相关文献

参考文献1

二级参考文献3

共引文献3

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部