期刊文献+

装备停产阶段备件末次采购量确定方法

Method for Determining Final Order for Spare Parts Before Idling Period of Equipment
下载PDF
导出
摘要 针对装备停产后面临的备件末次采购问题,提出装备停产后续保障时间确定方法,在此基础上,以装备停产备件保障成本为约束,建立以装备完好率最大为目标的备件末次采购量确定模型,采用边际效能分析法对模型进行求解,依据单位价格备件对装备完好率的贡献度得出备件末次采购方案。结合算例分析探讨模型的有效性,结果表明该方法能够为备件保障人员合理规划经费预算并制定备件末次采购计划提供决策依据。 For the final purchase problem of spare parts before idling period of equipment,this paper proposes a method for determining the guarantee time of equipment production,on the basis of this,based on the cost of spare parts,the model is established for the final purchase quantity of spare parts with the maximum equipment completion rate. The model is solved by means of marginal efficiency analysis. According to the materiel operational rate contribution of the unit price of spares,the final procurement plan is concluded. The validity of the model is discussed with the example analysis,the results show that this method can provide the decision-making basis for the reasonable planning of spare parts guarantee personnel and the final purchase plan of spare parts.
作者 董骁雄 宋玉 刘玭 李建昌 陈云翔 DONG Xiao-xiong;SONG Yu;LIU Pin;LI Jian-chang;CHEN Yun-xiang(Air Force Surplus Aireraft Storage Center, Pingdings han 467300,China;School of Equipment Management & UAV Engineering, Air Force Engineering University,Xi'an 710051,China)
出处 《火力与指挥控制》 CSCD 北大核心 2019年第9期28-31,共4页 Fire Control & Command Control
基金 国家自然科学基金(71571190,71601183,L1534031) 陕西省自然科学基金资助项目(2014JQ2-7045)
关键词 装备 停产 备件 末次采购量 equipment idling spare parts final order
  • 相关文献

参考文献2

二级参考文献63

  • 1杨士林,彭良雪.二重积分定义的函数求导[J].高等数学研究,2006,9(2):40-41. 被引量:6
  • 2[1]FortuinL,Martin H.Control of service parts.International Journal of Operations & Production Management,1999;19(9):950-971
  • 3[2]Teunter R H.Fortuin L.End-of-life service:a case study.Opera-tional Research,1998;107(4):19-34
  • 4[3]Teunte R H.Haneveld W K.Inventory control of service parts in the final phase.Operational Research,2002;137(1):497-511
  • 5[4]Teunter R H,Haneveld W K.The"final order"problem.Operation-al Research,1998;107(2):35-44
  • 6[5]Wong Hartaoto.Stocking decisions for repairable spare parts pooling in a multi-hub system.Production Economics,2005;94(4):309-317
  • 7[6]Li S G,Kuo,X.The inventory management system for automobile spare parts in a central warehouse.Expert Systems with Applications,2007;68(1):1-10
  • 8[7]Willemain T R,Smart C N,Schwarz H F.A new approach to fore-casting intermittent demand for service parts inventories.Forecasting,2004;101(1):375-387
  • 9任敏,陈全庆,沈震.备件供应学[M].北京:国防工业出版社.2013,01.
  • 10CROSTON J D. Forecasting and stock control for inter- mittent demands[J]. Source Operational Research Quar- terly, 1972, 23(3).. 289-303.

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部