摘要
在矿井面临的诸多水害因素中,奥灰水因其含水量丰富,水头压力大等特征,对矿井安全的威胁程度也较大,在防止措施方面,常规的疏干降压、注浆改造工程显得盲目、不经济,因此提出强排水系统防治模式,防止奥水水害事故发生。
In many factors of water disasters in coal mine, the grey water has rich moisture and big head pressure characteristics, so it is threat to the safety of the mine, in the aspect of prevention measures and regular drainage step-down grouting reconstruction project is blind and not economic, so strong drainage system control model is put forward, to prevent the water damage accidents.
作者
崔江宏
CUI Jiang-hong(Changzhi Plateau Comprehensive Exploration Engineering Co.,Ltd.,Changzhi 046000,China)
出处
《煤》
2019年第10期25-26,33,共3页
Coal
关键词
强排水系统
注浆改造
奥灰承压水
strong drainage system
grouting reconstruction
ordovician artesian water