摘要 渝怀铁路涪秀二线隧道施工揭示大量溶洞,施工安全风险大;对岩溶隧道进行分类,针对不同情况采取砼回填、钢花管注浆、高压旋喷桩或桩基托梁(或梁桥)结构跨越等治理措施,结合现场工程实例验证,取得了良好的效果. A large number of karst caves were discovered during the tunnel construction in the Fuxiu second line of the Yuhuai Railway,with high safety risks during the construction.The karst tunnels are classified,and different control measures are taken according to different project conditions,including concrete backfill,steel tube grouting,high pressure jet grouting pile or pile foundation joist(or beam bridge) structure crossing.Well effect of construction is verified according to the site engineering project cases.
作者 姜波 Jiang Bo(Chongqing Company of China Railway Eryuan Engineering Group Co.,Ltd.,Chongqing 400015,China)
出处 《岩土工程技术》 2019年第5期299-302,共4页 Geotechnical Engineering Technique
关键词 隧道 岩溶 治理 tunnel karst measure
  • 相关文献

参考文献1

共引文献3

同被引文献143

引证文献9

二级引证文献131

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部