巨型多腔体多边形钢管柱现场定位及安装施工 被引量:2

IN-SITU POSITIONING AND INSTALLATION OF HUGE MULTI-CHAMBER POLYGONAL STEEL PIPE COLUMN
下载PDF
导出
摘要 昆明春之眼商业中心主塔楼每层有6根多腔体多边形超大巨型钢管柱,为保证首节巨型钢管柱和基础锚栓群定位连接精度,在现场定位、钢管桩拼装、吊装焊接等工序制订了正确的施工工艺和质量保证措施,取得了良好效果. The main tower building of Kunming Chunzhiyan (Eye of Spring) Commercial Center has six pieces of huge multi-chamber polygonal steel pipe columns on each floor. To guarantee the positioning and connection accuracy between the huge steel pipe columns and foundation anchor bolts, correct construction process and quality assurance measures were adopted for such processing steps as in-situ positioning, assembly, lifting and welding of steel pipe pile, achieving favorable effects.
作者 石立国 黄威 张贵明 邓剑 陈祥 SHI Li-guo;HUANG Wei;ZHANG Gui-ming;DENG Jian;CHEN Xiang(China Construction Second Engineering Bureau Ltd.,100010,Beijing,China)
出处 《建筑技术》 2019年第10期1199-1201,共3页 Architecture Technology
关键词 超高层钢结构 首节钢管桩定位 钢管桩焊接 super-high steel structure positioning of first steel pipe pile welding of steel pipe pile
  • 相关文献

参考文献1

二级参考文献4

共引文献6

同被引文献3

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部