摘要 装配式钢筋混凝土房屋的楼板普遍采用叠合楼板.由于叠合楼板施工采用二次浇注工艺,而浇筑的混凝土层凝结硬化需要一定时间,期间混凝土叠合层以荷载形式作用在预制板上,为保证其结构稳定性,需在预制板下搭设临时支撑.目前对叠合楼板搭设临时支撑的间距没有具体规定,在施工中其常用的搭设间距为1m.为优化施工方案,欲增大临时支撑搭设间距,但这会对叠合楼板结构性能产生影响.本文结合某具体工程,对3组搭设不同间距的临时支撑预制板构件进行试验,并通过理论计算,分析临时支撑对叠合楼板结构性能的影响,得出了常用叠合楼板施工临时支撑最优间距的计算公式. Composite slabs are commonly used in the assembled reinforced concrete buildings. Because of the secondary pouring technology used in the construction of the composite slabs, the concreting and hardening of concrete layers takes a certain time. During this period, the concrete laminated layer acts on the prefabricated board in the form of load and the thickness of the prefabricated plate is thin. In order to ensure its structural stability, temporary support should be installed under the prefabricated panel. At present, there is no specific provision for the spacing of the temporary support for the composite slabs, and the spacing of the temporary support commonly used in the construction scheme is 1 m. In order to optimize the construction scheme, it is necessary to increase the spacing of the temporary support, but it will have an impact on the structural performance of the composite slabs. Three groups of temporary support prefabricated plate components with different spacing spacing are tested in combination with a specific project . Through theoretical calculations, the effect of temporary support on the structural performance of the laminated building is analyzed. Finally, the calculation formula of the optimal spacing of the temporary support for the construction of the commonly used laminated floor is obtained.
作者 许建豪 贺冉 孟新田 刘建波 陈俊清 汤曦 XU Jianhao;HE Ran;MENG Xintian;LIU Jianbo;CHEN Junqing;TANG Xi(National Demonstration Center for Experimental Civil Engineering Education,Hunan City University,Yiyang,Hunan 413000,China)
出处 《湖南城市学院学报(自然科学版)》 CAS 2019年第5期22-26,共5页 Journal of Hunan City University:Natural Science
基金 湖南省自然科学基金资助项目(2018JJ2020) 湖南省大学生创新创业训练计划项目(201911527020,201811527008)
关键词 装配式 叠合楼板 施工临时支撑 最优间距 assembly type composite floor construction temporary support the optimal spacing
  • 相关文献

参考文献9

二级参考文献55

  • 1李东,连之伟.现浇混凝土楼板设计施工过程中的裂缝控制[J].上海交通大学学报,2005,39(5):751-754. 被引量:30
  • 2王依群,王福智.钢筋与混凝土间的黏结滑移在ANSYS中的模拟[J].天津大学学报,2006,39(2):209-213. 被引量:31
  • 3陈祖述 周明华.关于无箍迭合面抗剪强度的讨论[J].南京工学院学报,1988,18(1):145-147.
  • 403G 329-1.建筑物抗震构造详图[S].,..
  • 5GB50204-2002.混凝土结构工程施工质量验收规范[S].[S].,2002..
  • 6安徽省质量技术监督局.DB34/T810-2008 叠合板式混凝土剪力墙结构技术规程[S].合肥:安徽省质量技术监督局,2008.
  • 7SJG18-2009,预制装配整体式钢筋混凝土结构技术规范[S].
  • 8土木401-1996,混凝土工程设计规范与解说[S].
  • 908sJ 110-2,08SG333,预制混凝士外墙挂板[S].
  • 10JGJ/T 1-1991,装配式大板居住建筑设计与施工规程[S].