铁路建设项目压覆矿产资源补偿范围和一般方法 被引量:1

The Scope and General Method of Compensation for the Overlying Mineral Resources in Railway Construction Projects
下载PDF
导出
摘要 建设项目在征收土地时压覆矿产资源的情况比较复杂,实施补偿的目的是通过限制开采行为从而保护工程安全。按照国家现行法律法规和行业规范标准划定工程保护区域,并以其为基础确定压矿补偿范围和补偿内容,是做好压覆矿产资源补偿工作的有效方法。 The situation of the overlying mineral resources is complicated when land is expropriated for construction projects. The purpose of compensation is to protect the safety of the project by restricting mining activities. This essay delineates the project protection area according to the current laws and regulations of the state and the standards of the industry, and then determines the scope and content of compensation based on the protection area is an effective method to do the compensation work of the overlying mineral resources.
作者 易兵 YI Bing(Engineering management center,China National Railway Group Co.,Ltd.,Beijing 100844,China)
出处 《铁道经济研究》 2019年第5期31-33,共3页 Railway Economics Research
关键词 压覆矿产资源 铁路工程保护区域 补偿范围 补偿内容 overlying mineral resources railway constructive projects compensation scope compensation content
  • 相关文献

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部