八姑阿莫隧道地下水环境影响预测 被引量:2

Study on Groundwater Environmental Impact of Jiupansi Tunnel
下载PDF
导出
摘要 以穿越西昌至香格里拉高速公路八姑阿莫隧道为例,在工程地质勘察基础上,研究地下水流动类型,分析地下水排泄补给方式,计算地表径流流、地下汇流量以及施工引发的涌水量,最终计算得到隧道施工期最大涌水量为9756m3/d,正常涌水量为6504m3/d,地下水降位漏斗最大影响半径880m。从对地下水及生态环境影响的角度,在加强超前预测的情况下,目前修建隧道是合理的、可行的,不会产生较大的地下水环境问题,对附近居民及上部生态的影响较小。 Takingbaguamo Tunnelcrossing Xichang-Shangri-la expresswayasan example,based on engineering geological investigation, groundwater flow typesare studied, groundwater dischargeand recharge modesareanalyzed,and surface runoff, undergroundconfluenceand water inflowcausedbyconstruction arecalculated. Finally, the maximum water inflow during tunnelconstruction iscalculated tobe 97.56 m3/d, 6 504 m 3/d of normal water inflow, 880 m of maximum influence radius of groundwater depression funnel. From the point of view of groundwaterand ecological environment impact, it is reasonableand feasible toconstruct tunnels under the condition of strengtheningadvance prediction, which will not cause larger groundwater environmental problemsand have less impact on nearby residentsand upper ecology.
作者 王梓龙 吴昊宇 林华章 刘浩 WANG Zi-long;WU Hao-yu;LIN Hua-zhang;LIU Hao(Citycollege of Southwest University of Scienceand Technology, MianYang 621000, Sichuan,china;Sichuan Highway Planning Surveyand Design Research Instituteco.Ltd.,Chengdu 610059,China;China Three Gorgesconstruction Managementco.Ltd.,Chengdu 610000,China)
出处 《水利科技与经济》 2019年第10期13-19,共7页 Water Conservancy Science and Technology and Economy
基金 四川省教育厅资助项目(18ZA0057)
关键词 隧道 地下水 涌突水 径流 tunnel groundwater water inrush runoff
  • 相关文献

参考文献9

二级参考文献55

共引文献40

同被引文献6

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部