摘要
传统竣工测量成果表达方式的不直观和判读性差等问题,已不能满足后期运维管理的要求。针对这一现状,以郑州航空港区双鹤湖地下综合管廊施工质量检验为例,运用徕卡P30三维激光扫描仪器对综合管廊节点部位进行实景测量,对原始数据进行提取,导入Cyclone软件中进行点云去噪、拼接等处理,通过Revit快速三维逆向建模,并将BIM模型与测量模型对比来检测施工质量。
In view of the present situation, this paper takes theconstruction quality inspection of Shuanghehu underground comprehensive pipeline gallery in Zhengzhouairportasan example, uses Leica P30 three-dimensional laser scanner to measure the joint position of thecomprehensive pipeline gallery, extracts the original dataand imports it into Cyclone softwarecarries out pointcloud denoising, stitching and other processing, through the rapid three-dimensional reverse modeling of Revit,andcompares thebIM model with the measurement model to detect theconstruction quality.
作者
马奔
MA ben(Northchina University of Water Resourcesand Electric Power, Zhengzhou 450046,china)
出处
《水利科技与经济》
2019年第10期84-88,共5页
Water Conservancy Science and Technology and Economy