8WALKER J. Condition based risk management[J]. Power Engineer, 2003,17( 1 ) :34-35.
9HUGHES D,DENNIS G,WALKER J,et al. Condition Based Risk Management(CBRM)-enabling asset condition information to be central to corporate decision making[C]//Proceedings of the 1st World Congress on Engineering Asset Management. Gold Coast,Australia : WCEAM, 2006 : 1212-1217.
10JIANG Y,MCCALLY J D,VOORHIS T V. Risk-based resource optimization for transmission system maintenance [J]. IEEE Trans on Power Systems, 2006,21 (3) : 1191-1200.