期刊文献+

坚硬顶板预裂爆破强制放顶数值分析 被引量:2

Numerical Analysis of Forced Caving of Hard Roof by Presplitting Blasting
下载PDF
导出
摘要 大同焦煤一矿8503工作面顶板为坚硬的砂岩,为探讨坚硬顶板条件下采取预裂爆破强制放顶方法的实际效果,以大同焦煤一矿8503工作面为研究对象,通过数值仿真模拟,对强制放顶断裂特征、预裂高度对顶板破断特征影响进行分析。结果表明,该方法使顶板应力得到有效控制,而且在合理的预裂高度范围内,顶板弱化效果突出。 The roof of the 8503 working face in Datong No. 1 Coking Coal Mine is made up of hard sandstone. In order to study the practical effect of forced caving by presplitting blasting under hard roof conditions, the numerical simulation of the 8503 working face was carried out to analyze the influence of forced caving and pre-splitting height on roof fracture characteristics. The results show that the method can effectively control the roof stress, and the roof weakening effect is prominent within a reasonable pre-cracking height range.
作者 温有财 Wen You-cai(Datong Coking Coal Mine Co., Ltd., Shanxi Datong 037000)
出处 《山东煤炭科技》 2019年第10期59-60,64,72,共4页 Shandong Coal Science and Technology
关键词 坚硬 顶板 弱化 模拟 hard roof weaken numerical
  • 相关文献

参考文献4

二级参考文献15

共引文献41

同被引文献16

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部