期刊文献+

全自动车辆段停车列检库线信号设备布置方案分析 被引量:2

Scheme Analysis of Signal Equipment Layout of Parking Track in Fully Automatic Depot
下载PDF
导出
摘要 针对济南轨道交通全自动运行项目对于车辆段土建预留方案的讨论,分析停车列检库线设置长度的考虑因素及原理,提出库线信号系统典型的轨旁设备布置方案。为全自动车辆段项目库线的长度确定和轨旁设备布置提供参考。 Aiming at the discussion of civil engineering reservation schemes for depots in Jinan Rail Transit Fully Automatic Operation Project, this paper analyses the factors and principles of the length of parking track, and puts forward a typical layout scheme of trackside equipment for the signal system of the parking track. It provides a reference for the determination of the length of the parking track and the layout of the trackside equipment in the fully automatic depot.
作者 董洪卫 Dong Hongwei(CRSC Research & Design Institute Group Co., Ltd, Beijing 100070, China)
出处 《铁路通信信号工程技术》 2019年第10期13-16,共4页 Railway Signalling & Communication Engineering
关键词 全自动车辆段 信号 设备布置 分析 fully automatic depot signal equipment layout analysis
  • 相关文献

参考文献3

二级参考文献8

共引文献21

同被引文献10

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部