摘要
以某超高层住宅小区为例,讨论该小区室内消火栓给水系统的定案过程。除技术探讨外,分别从建设单位(甲方)和设计单位(乙方)二者不同的角色立场出发,换位思考,剖析在工程建设过程中双方的思维侧重点差异。
Based on some super high-rise residential project,this paper demonstrates the finalization process of the indoor hydrant system in the buildings.In addition to the technical discussion, from the standpoints of the different roles of owner(Party A) and designer(Party B), we interpret and analyze the differences in thinking between the two sides during the construction process are interpreted and analysed.
作者
叶华琴
Ye Huaqin(Quanshun Group (Xiamen )Real Estate Co.,Ltd,, Xiamen 361000 , China)
出处
《给水排水》
CSCD
北大核心
2019年第10期103-105,110,共4页
Water & Wastewater Engineering