期刊文献+

西安市第三污水处理厂三期工程工艺设计与运行效果

Process Design & Operation Effect of Phase III Project of Xi’an No.3 Sewage Treatment Plant
下载PDF
导出
摘要 西安市第三污水处理厂三期工程设计规模为5×10^4m^3/d,污水处理采用改良型底曝氧化沟工艺,出水水质达到GB18918—2002《城镇污水处理厂污染物排放标准》的一级A标准;污泥处理采用重力浓缩、机械离心脱水工艺。介绍该工程的设计进出水水质指标、主要构筑物的工艺设计参数及工艺设计特点。 The design scale of the third phase project of Xi’an No.3 Sewage Treatment Plant is 5×10~4 m^3/d. The improved bottom aeration oxidation ditch process is adopted for sewage treatment. The effluent quality meets the first A standard of GB 18918-2002 Pollutant Discharge Standard for Urban Sewage Treatment Plant. The gravity concentration and mechanical centrifugal dewatering process are used for sludge treatment. The design water quality index, process design parameters of main structures and process design characteristics of the project are introduced.
作者 戴雪峰 石建会 DAI Xue-feng;SHI Jian-hui(CSCEC AECOM Consultants Co.,Ltd.,Lanzhou 730000,China)
出处 《中国市政工程》 2019年第5期42-44,104-105,共4页 China Municipal Engineering
关键词 改良型底曝氧化沟 脱氮除磷 一级A标准 滤布滤池 improved bottom aeration oxidation ditch nitrogen and phosphorus removal first A standard cloth-media filtration
  • 相关文献

参考文献3

二级参考文献9

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部