青山水库输水工程石膏岩洞段支护衬砌设计方案优化研究 被引量:4

Study on Optimization of Support Lining Design Plan for Gypsum Cave Section in Qingshan Reservoir Water Conveyance Project
下载PDF
导出
摘要 新奥法施工需要充分利用围岩的自我承载力,对自我承载力较差的洞段实施比较困难。文章以青山水库输水工程石膏岩施工段为例,对开挖施工过程中的支护衬砌原方案进行优化调整,提出优化设计方案,利用数值模拟的方法进行优化方案的安全性分析,结果显示:优化设计方案下的围岩安全系数完全满足评价标准要求。 The self-bearing capacity of surrounding rocks should be fully utilized in the construction of New Austrian Tunneling Method, and it is difficult to implement the tunnel section with poor self-bearing capacity. Qingshan Reservoir Water Conveyance Project gypsum rock construction is adopted as an example in the paper. The support lining original plan in the excavation construction is optimized and adjusted. An optimization design plan is put forward. The method of using numerical simulation is utilized for analyzing the safety of the optimization plan. The results show that the surrounding rock safety coefficient under the optimization design plan fully meets the requirements of evaluation standards.
作者 李勇 LI Yong(Soil and Water Conservation Station, Liaoning Huanren County Water Resources Bureau, Huanren 117200, China)
出处 《中国水能及电气化》 2019年第10期36-39,共4页 China Water Power & Electrification
关键词 输水隧洞 石膏岩 支护衬砌 优化 water tunnel gypsum rock supporting lining optimization
  • 相关文献

参考文献8

二级参考文献51

共引文献213

同被引文献18

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部