摘要
基于呼和浩特抽水蓄能电站水淹厂房的危害性,从外来水源和电站自身设备情况对水淹厂房进行了风险分析,根据电站的技术、设备、操作、防汛等条件提出了相关防控措施,为防范水淹厂房事故提供了参考依据。
Powerhouse drowning may result in serious damages to power stations.The risk of powerhouse drowning is analyzed for Huhhot Pumped Storage Power Station considering the risks from the outside flood and the power plant equipment.Prevention and control measures are then proposed correspondingly from the aspects of technology, equipment, operation and flood control.It provides useful reference for the prevention of powerhouse drowning accident.
作者
董超
王乐
毛婵
DONG Chao;WANG Le;MAO Chan(Hohhot Pumped Storage Power Generation Co., Ltd., Hohhot 010051, China)
出处
《水电与新能源》
2019年第10期54-55,共2页
Hydropower and New Energy
关键词
水淹厂房
风险分析
防控措施
powerhouse drowning
risk analysis
prevention and control measures