期刊文献+

黄登水电站地下厂房洞室群防渗排水设计 被引量:1

Design of Seepage Prevention and Drainage of Underground Powerhouse in Huangdeng Hydropower Station
下载PDF
导出
摘要 黄登水电站地下厂房地段地下水位线较高,且距水库较近,为降低围岩的外水压力,以利于地下洞室的围岩稳定,同时也为防止地下水向地下厂房渗漏,在地下厂房顶部及四周设置防渗及排水系统。防排水设计采用“以排为主,防、排、堵、截相结合”的综合治理措施。通过一段时间的运行,证明其防渗排水系统的设计是合理的。 The underground water level of underground powerhouse in Huangdeng Hydropower Station is higher, and the underground powerhouse is close to the reservoir. In order to decrease external water pressure of surrounding rock, facilitate the stability of surrounding rock of underground powerhouse, and prevent groundwater seepage to the underground powerhouse, anti-seepage and drainage system are set on the top and around the underground powerhouse. The comprehensive treatment measures of “taking drainage as the main measure, combining prevention,drainage, blocking and interception” are adopted in the design of water prevention and drainage. Through a period of operation, it is proved that the design of the anti-seepage and drainage system is reasonable.
作者 柴余松 杨世界 CHAI Yu-song;YANG Shi-jie(PowerChina Kunming Engineering Corporation Limited,Kunming 650051,Yuman China)
出处 《云南水力发电》 2019年第5期77-81,共5页 Yunnan Water Power
关键词 黄登水电站 地下厂房 防渗 排水 Huangdeng Hydropower Station underground powerhouse seepage prevention drainage
  • 相关文献

参考文献4

二级参考文献2

共引文献17

同被引文献20

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部