大朝山水电站同步相量测量装置(PMU)更新改造 被引量:1

Renovation of Synchronous Phasor Measurement Unit (PMU) in Dachaoshan Hydropower Station
下载PDF
导出
摘要 2018年4月至12月,大朝山水电站利用机组停机及220kV系统、500kV系统停电检修的有利时机,进行了同步相量测量装置(PMU)的升级改造。据了解,大朝山水电站为云南省首座使用该套同步相量测量装置的水电厂。主要介绍了更新改造过程中的各个重要节点的重点事项,遇到的困难和解决的方式,遗留的问题及应对的方法。目前,更新改造工作已完成,装置投运正常。 From April to December 2018, Dachaoshan Hydropower Station upgraded the synchronous phasor measurement unit(PMU) by taking advantage of the opportunity of unit shutdown and outage maintenance of 220 kV system and 500 kV system. It is understood that Dachaoshan Hydropower Station is the first hydropower station in Yunnan Province to use the synchronous phasor measurement device. This paper mainly introduces the key points of each important node in the renovation process, the difficulties encountered and the ways to solve them, the problems left behind and the ways to deal with them. It has reference significance for the renovation of the same type of equipment in brother power plants. At present, the renovation work has been completed and the plant has been put into operation normally.
作者 邓智充 DENG Zhi-chong(Guotou Yunnan Dachaoshan Hydropower Co.,Ltd,Kunming 650041,China)
出处 《云南水力发电》 2019年第5期136-140,共5页 Yunnan Water Power
关键词 PMU 同步相量 数据采集 键相脉冲 大朝山水电站 PMU synchronous phasor data acquisition key phase pulse Dachaoshan Hydropower Station
  • 相关文献

参考文献2

二级参考文献10

共引文献2

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部