期刊文献+

PPP模式下城市基础建设风险评估研究

Research on Risk Assessment of Urban Infrastructure Construction under PPP Mode
下载PDF
导出
摘要 本文结合目前城市基础建设系统,对城市基础设施项目融资中引入PPP模式进行研究,对城市基础设施建设投资模式的权责进行划分,运用层次分析法对PPP模式下基础建设投资进行量化分析,以进一步明确市场准入准则,建立相对应的投资者筛选机制,制定合理的回报机制。 Combining with the current urban infrastructure system, this paper studied the introduction of PPP mode into urban infrastructure project financing, divided the rights and responsibilities of investment mode of urban infrastructure construction, and made quantitative analysis of infrastructure investment under PPP mode by using analytic hierarchy process, so as to further clarify market access criteria and establish phase, establish the corresponding investor screening mechanism and formulate a reasonable return mechanism.
作者 胡良宝 张玮 HU Liangbao;ZHANG Wei(School of Management Science and Engineering,Anhui University of Finance and Economics,Bengbu Anhui 233030)
出处 《河南科技》 2019年第23期96-100,共5页 Henan Science and Technology
基金 2018年国家级大学生创新创业训练项目(201810378336)
关键词 PPP模式 城市基础建设 风险评估 层次分析法 PPP model urban infrastructure risk assessment analytic hierarchy process
  • 相关文献

二级参考文献26

  • 1吴孝灵,周晶,彭以忱,段庆康.基于公私博弈的PPP项目政府补偿机制研究[J].中国管理科学,2013,21(S1):198-204. 被引量:101
  • 2彭祖赠,孙韫玉.模糊数学及其应用[M].武汉:武汉大学出版社,2007.
  • 3杨林权.2005.管理系统工程[M].广州:暨南大学出版社.
  • 4王雪青,喻刚,邴兴国.PPP项目融资模式风险分担研究[J].软科学,2007,21(6):39-42. 被引量:90
  • 5杨卫华,工秀山.公共项日PPP模式选择路径研究[J].华东经济管理,2012(6):6367.
  • 6LiB, Risk Management of Public/Private Partnership Pro-jects. Un-published PhD Thesis[M]. School of the Builtand Natural Environment. Glasgow Caledonian University. Glasgow, Scotland. 2003.
  • 7A. V. Thomas, SatyanarayanaN. Kalidindi, Modeling and assessment of critical risks in BOT road projects, Construction Management and Economics, 2006 ( 4 ) : 407-424.
  • 8S. Ebrahimnejad, S. M. Mousavi, H. Seyrafianpour, Risk identification and assessment for build operate transfer projects: a fuzzy multi attribute decision making model, Expert Systems with Applications, 2010, 37: 575-586.
  • 9Yelin Xu, John F. Y. Yeung, Albert P. C. Chan, Daniel W. M. Chan, Shou Qing Wang. Developing a risk assessment model for PPP projects in China - A fuzzy synthetic evaluation approach[J] . Automation in Construction, 2010, 19 ( 7 ) : 929-943.
  • 10Katrin Fischer, Katja Leidel, Alexander Riemann. An integrated risk management system (IRMS) for P PP projects[J]. Journal of Financial Management of Property and Construction, 2010 (15) : 262 269.

共引文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部