摘要
近几年,煤化工企业建设进程不断加快,其工程项目质量直接决定了煤化工企业今后运行的质量和成本,需要相关部门结合煤化工企业安装质量控制要求进行统筹处理,确保质量符合标准。论文对煤化工仪表施工的准备阶段、施工过程以及竣工阶段的仪表安装质量控制要求进行了分析。
In recent years, the construction process of coal chemical enterprises has been continuously accelerated, and the quality of their engineering projects directly determines the quality and cost of their future operation, which requires the relevant departments to combine with the installation quality control requirements of coal chemical enterprises for overall treatment to ensure that the quality meets the standards. This paper analyzes the quality control requirements of instrument installation in the preparation stage, construction process and completion stage of coal chemical instrument construction.
作者
周青
ZHOU Qing(Taiyuan New Chemical Materials Co. Ltd. of Yangquan Coal Industry(Group) Co. Ltd.,Taiyuan 030400,China)
出处
《工程建设与设计》
2019年第20期87-88,共2页
Construction & Design for Engineering
关键词
煤化工
仪表安装
质量控制
coal chemical industry
instrument installation
quality control