期刊文献+

考虑电能与备用联合出清的日前调度优化方法 被引量:2

A day-ahead optimization scheduling method considering combined clearing of electric energy and reserve auxiliary service
下载PDF
导出
摘要 为解决电力现货市场与辅助服务市场改革不断深入带来的日前调度计划编制模式转变问题,提出了一种考虑电能与备用辅助服务联合出清的日前调度优化方法。首先,剖析了电能与备用辅助服务之间的耦合关系,从机组运行特性和电网承载能力两个维度出发,明确了电能与备用联合出清中需要考虑的运行约束项。接着,以综合购电成本最低为优化目标,全面考虑电网运行、电力平衡、机组运行等三方面约束条件,构建了电能与备用辅助服务联合出清下的日前调度优化模型。并根据模型特点,明确了求解方法。最后基于我国某省区电网实际数据构造的算例表明,该方法能够有效提升发电资源调用效率,避免由于备用均摊等方式造成的发电机组中标量超过系统承载能力或发电机组发电能力的问题。 In order to solve the problem of day-ahead scheduling mode transformation brought by the deepening reform of the spot market and auxiliary service market,a day-ahead scheduling optimization method considering the combined clearing of electric energy and auxiliary service is proposed. Firstly,the coupling relationship between electric energy and reserve auxiliary service is analyzed,and the operational constraints to be considered in the joint clearing of electric energy and standby are clarified from the two dimensions of unit operation characteristics and power network carrying capacity. Then,taking the lowest comprehensive power purchase cost as the optimization target,and considering the constraints of power network operation,power balance and unit operation,the day-ahead dispatching optimization model of combined power and standby auxiliary service clearance is constructed. According to the characteristics of the model,the solution method is put forward. Finally,a case study based on the actual data construction of a provincial power grid in China shows that this method can effectively improve the efficiency of power generation resource utilization and avoid the problem that the scalar quantity in the generator sets exceeds the load capacity of the system or the generating capacity of the generator sets caused by standby equalization.
作者 林洁 莫东 卓毅鑫 黄红伟 游成彬 张德亮 LIN Jie;MO Dong;ZHUO Yixin;HUANG Hongwei;YOU Chengbin;ZHANG Deliang(Guangxi Power Grid Power Dispatching Center,Nanning 530000 Guangxi,China;Beijing Qingda Keyue Co. ,Ltd. ,Beijing 100084,China)
出处 《电力大数据》 2019年第10期36-42,共7页 Power Systems and Big Data
基金 南方电网公司科技项目(考虑多市场化交易的长中短期发电调度优化和安全校核技术研究及应用GXKJXM20170362)支持
关键词 电力现货市场 备用辅助服务 联合出清 日前调度计划 耦合关系 spot power market reserve ancillary services combined clearing day-ahead scheduling coupling relationship
  • 相关文献

参考文献13

二级参考文献121

共引文献272

同被引文献30

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部