期刊文献+

BIM+VR/AR/MR在施工阶段的应用 被引量:7

Application of BIM+VR/AR/MR in Construction Stage
下载PDF
导出
摘要 与传统的图纸指导相比,基于BIM技术的施工项目可以进行技术交底,把现施工过程通过三维真实的显现出来,并且通过三维技术形象地把施工中的每一个细节展现出来,提高了施工人员的工作效率,工程施工变得更加简单,还能有效地将施工技术通过三维模型传递给施工人员,极大地提高了项目的质量。 Compared with the traditional drawing guidance,the construction project based on BIM technology can carry out the technical disclosure,show the existing construction process through three-dimensional reality,and show every detail in the construction through the three-dimensional technical image. The work efficiency of the construction personnel,the construction of the project becomes simpler,and the construction technology can be effectively transmitted to the construction personnel through the threedimensional model,which greatly improves the quality of the project.
作者 夏中天 Xia Zhong-tian
出处 《建筑技术开发》 2019年第19期83-84,共2页 Building Technology Development
关键词 传统施工 施工阶段 具体应用 traditional construction construction stage specific application
  • 相关文献

参考文献4

二级参考文献29

  • 1王刚,高燕辉.BIM时代的项目管理[J].建筑经济,2011,32(S1):34-37. 被引量:18
  • 2任宏,祝连波.施工企业成本管理现状分析及对策研究[J].建筑经济,2005,26(12):68-70. 被引量:37
  • 3Chuck Eastman, Paul Teicholz, Rafael Sacks (Eds.).BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors [M], NewYork:John Wiley and Sons, 2008:233-244.
  • 4中国对外承包工程商会.我国50家内地企业入选2011年度ENR全球最&225家国际承包商[EB/OL].2011-09-07[2012-12-23].http://www.chinca.org/cms/old/20110927144801.pdf.
  • 5Salman Azhar, Michael Hein, Blake Sketo. Building Information Modeling (BIM) : benefit, risks and challenges [EB/OL].http://ascpro.ascweb.org/chair/paper/CPG - -T182 02008.pdf.
  • 6徐荣,王旭峰,杨勤.土木工程施工项目成本管理与实例[M].济南:山东科学技术出版社,2004.
  • 7Chuck Eastman, Teicholz Paul, Sacks Rafael, etc. B1M handbook [M]. USA : John Wiley & Sons Inc, 2010 : 277- 281.
  • 8Smith Dana K,Tardif Michael. Building Information Modeling:a strategic implementation guide for architects, engineers, constructors, and real estate asset managers [M].USA: John Wiley & Sons Inc,2009:116-117.
  • 9基于BIM技术的施工阶段整体解决方案[J].土木建筑工程信息技术,2015,7(3):28-29.
  • 10王广斌,张洋,杨学英,张文娟.工程项目建设信息化发展方向--虚拟设计与施工[J].武汉大学学报(工学版),2008,41(2):90-93. 被引量:33

共引文献173

同被引文献46

引证文献7

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部