摘要
结合百色水利枢纽工程 ,就大型水利工程中央财政国库支付制度存在的问题 。
Combining with BMPDP, put forth the existing problems of the central finance fiscal payment system for the large sized WR project. Also, the corresponding suggestion was expounded here.
出处
《广西水利水电》
2002年第B10期86-87,共2页
Guangxi Water Resources & Hydropower Engineering