摘要
本文详细介绍了万家寨引黄南干一级泵站出水压力平洞及压力竖井监测仪器的布置和安装埋设措施,并就施工中遇到的问题进行了探讨与总结,摸索出一条适用于压力洞井监测仪器埋设的新方法,从而有效地保证了仪器安装埋设的质量和进度。
In this paper,the process to bury the monitoring instruments in the pressure outlet horizontal and in the shaft of pumping station NO.1 of the south main line, Wanjiazhai YRDP is introduced. Some problems met in the construction are summarized.Especially a lot of new ways for embedding the instruments have been groped.
出处
《山西水利科技》
2002年第4期16-19,共4页
Shanxi Hydrotechnics