任庄水库除险加固工程有关问题及对策 被引量:1

Problems and Countermeasures on Danger Removing and Strenthening Project in Renzhuang Reservoir
下载PDF
导出
摘要 本文针对任庄水库除险加固工程中存在的有关问题作介绍并提出建议 The Renzhuang Reservoir lies on a tributary of the Qinhe River,Shanxi,which empties into the Yellow River.The reservoir data are:drainage area above dam,1298.6km2;dam type,rolled earth dam;dam heigt,35.3m;total capacity of the reservoir,80 500 000m3;date of construction completion,1960.The problems concerned on the danger removing and strenthening project(including mainly the renovation of upstream dam slope,the modification of spillway,the thickening of downstream dam slope and the construction of emergency spillway) of the reservoir and some proposals to solve the problems are introduced in this paper.
作者 冯牛
出处 《山西水利科技》 2002年第4期33-34,共2页 Shanxi Hydrotechnics
关键词 任庄水库 除险加固 工程质量 施工现场 Renzhuang Reservoir