摘要
本文介绍了本监理公司在山西省万家寨引黄工程联接段PCCP输水安装Ⅱ标施工过程中的一些具体做法。
A series of measures taken for quickening the tempo of PCCP(prestressed concrete cylinder pipe) installation in the “connection works”,Wanjiazhai YRDP(Yellow River Diversion Project)by supervisor (shanxi provincial Co.of water and water power construction) are instroduced in this paper.
出处
《山西水利科技》
2002年第4期69-71,共3页
Shanxi Hydrotechnics