A 600-m Jacketing Line of Cable-In-Conduit Conductor (CICC) and the First 600-m Dummy Cable

A 600-m Jacketing Line of Cable-In-Conduit Conductor (CICC) and the First 600-m Dummy Cable
下载PDF
导出
摘要 A cable-in-conduit conductor(CICC ) production line was designed and constructed in Institute of Plasma Physics of Chinese Academy of Sciences (IPPCAS) by the end of 2000. It can produce a length of 600 meters and three kinds of sections of 20.8±0. 1×20.8±0.1, 20.4±0. 1×20.4± 0.1 and 18.6±0.1×18.6±0.1mm2. If the rollers of the shaping machine are changed, it can also produce other sizes of CICCs. So-called inserting-cable technology is adopted in this production line, where the procedures consist of tube pre-treatment (cleaning, pressure and leakage testing, end cutting), conduits butt-welding, six kinds of quality checking (endoscopy, dye penetration, pressure control, leakage testing, ultrasonic inspection and X-ray testing), cable inserting, shaping (compacting & squaring), pre-bending & winding and final checking. Now all the instruments and facilities required for these technologies have been installed and got ready. Some key technologies have been explored and good results obtained. Some short samples were produced and a 600 meters long sample was made out in August, 2001. A cable-in-conduit conductor(CICC ) production line was designed and constructed in Institute of Plasma Physics of Chinese Academy of Sciences (IPPCAS) by the end of 2000. It can produce a length of 600 meters and three kinds of sections of 20.8±0. 1×20.8±0.1, 20.4±0. 1×20.4± 0.1 and 18.6±0.1×18.6±0.1mm2. If the rollers of the shaping machine are changed, it can also produce other sizes of CICCs. So-called inserting-cable technology is adopted in this production line, where the procedures consist of tube pre-treatment (cleaning, pressure and leakage testing, end cutting), conduits butt-welding, six kinds of quality checking (endoscopy, dye penetration, pressure control, leakage testing, ultrasonic inspection and X-ray testing), cable inserting, shaping (compacting & squaring), pre-bending & winding and final checking. Now all the instruments and facilities required for these technologies have been installed and got ready. Some key technologies have been explored and good results obtained. Some short samples were produced and a 600 meters long sample was made out in August, 2001.
出处 《Plasma Science and Technology》 SCIE EI CAS CSCD 2002年第1期1163-1170,共8页 等离子体科学和技术(英文版)
  • 相关文献

参考文献1

  • 1V.E Sytnikov,A.V.Taran,V.A.Mitrokhin,et al.,Fusion Engineering and Design 45(1999) 209-216.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部