摘要
介绍200MW机组轴承油档及前箱调速系统各操作手柄漏油的解决办法,从主油系统排烟装置及油档改进入手。
By lmproving the gas exhaustion device and the oil damper in the maill - oil system, a solution to the oil leakage from the bearing oil - damper and each operation handle of the front - box speed - con-trol system in 200MW unit is introduced.
出处
《电力学报》
1999年第4期238-240,共3页
Journal of Electric Power