摘要
简要介绍了江水北调工程的运行体制和机制及其特点 ,根据工程近十年的运行情况 ,分析了翻水费的结构和变动趋势 ,对泵站累计单方水翻水成本进行了初步测算 ,提出了提高远距离调水工程经济技术指标的途径和措施 ,为进一步研究分析大型跨流域调水工程的运行成本 ,建立动态水价模型作一些探索。
The article presents the running system, mechanism and characteristic of the engineering of transforming water from the Yangtze river to the north of Jiangsu province in brief. According to the practice of the engineering in recent decade, the article analyses the structure and developing trend of the cost of water pumping (CWP), and counts the accumulative CWP per cubic meter elementarily. Meanwhile, the article puts forward the approach and measure on how to improve the economical and technical targets of transforming water from long distance. All these research will lead to further study on the cost of water transforming with large multi-drainage-area engineering and establish the dynamic water-price model.
出处
《排灌机械》
2002年第5期3-6,共4页
Drainage and Irrigation Machinery
基金
国家自然科学基金资助项目 (编号 :5 0 1790 32 )
关键词
江水北调工程
运行管理
中国
调水工程
Water transforming to the north, Running, Management analysis