1[1]Gulf Publishing Company and Scientific Surveys Ltd.:Evaluation of pipel ine-drying techniques,Pipeline Pigging Conference(Jakarta,Indonesia),1996 .
2[2]H.L.Stowers Jr.:Offshore pipeline drying with dry air and pigs,OTC 6773,1 991.
3[3]Tony Barber:The UK-Europe Interconnector pipeline:pigging and testing,Pip es & Pipelines Int.,1999,44(5) 5~17.
4[4]Christian Falck et al:Precommissioning and commissioning of Eur opipe-an environmental challenge,Pipes & Pipelines Int.,1996,41(4) 16 ~22.
5[5]Christian Falck et al:Commissioning the Zeepipe system sets new standards,Pipeline Gas Journal,1994,221(8) 24~33.
6[6]Jarieiv Maribu et al:The Zeepipe experience:pigging 814 km of subsea gas pipeline in the North Sea,Pipes & Pipelines Int.,1994,39(8) 1 6~22.
7[7]Yanaglda,K.:Pipeline technology:How the vacuum process dried a large diameter gas pipeline,Pipe Line Industry,1988(9) 26~30.
8[8]Gorden Willetts:Construction and commissioning of the Scotland t o Nort hern Ireland natural gas pipeline, Pipes & Pipelines Int.,1998,43(3) 5~2 7.
9[9]Villiam Battarra et al:Mathematical model predicts performance of pip eline drying with air,Oil & Gas Journal,1984,82(24) 114~116.
10[10]Abdulahani A.Al-Farayedhi:PC program developed for estimatin g pipeline drying time,Oil & Gas Journal,1999,97(7) 52~55.