敏捷制造ERP中的关键优化问题及其数学模型 被引量:6

Key Optimization Problems and Models for ERP of Agile Manufacturing
下载PDF
导出
摘要 敏捷制造企业对供应链计划、动态联盟的组成与风险利润分配等多种功能的需要 ,带来了一系列新的优化问题。研究了对其中的几个相关的优化问题 ;建立了新产品投入时间计划、动态结盟的伙伴企业挑选、供应链的分销网络设计、风险防范投资、分布式多工厂生产计划 ,以及分布式仓库存储控制等问题的数学模型 ;对模型可能的求解方法进行了探讨。模型与算法已成功应用到开发中的面向敏捷制造的ERP系统中。 Agile manufacturing enterprises require ERP with some new optimization problems such as supplying chain planning, dynamic alliance forming, allocation of profit and risk, and so on. They bring a series of emergent optimization problems to researchers. Several key problems among them are discussed. The models of the introduction time planning of new products, the partner selection of dynamic alliance, optimal design of distribution network in supply chain, investment planning to reduce risk, production planning of multi-location plants, and inventory control of multi location warehouses are established. The solution methods for these problems are discussed, too. The models and algorithms have been successfully applied into the experimental AM/ERP software.
出处 《控制工程》 CSCD 2002年第6期1-6,共6页 Control Engineering of China
基金 国家 8 63计划CIMS主题资助项目 (863 5 11 844 0 11) 国家自然科学基金资助项目 (699740 3 9 60 0 840 0 3 )
关键词 敏捷制造 ERP 优化问题 数学模型 agile manufacturing ERP dynamic alliance modeling and optimization software developing
  • 相关文献

参考文献17

  • 1蒋新松,张申生.敏捷竞争的挑战与思考[J].计算机集成制造系统-CIMS,1996,2(1):3-9. 被引量:73
  • 2Gunasekaran A. Agile manufacturing: enablers and an implementation framework [J]. Int J Production Researeh, 1998, 36(5) : 1223-1247.
  • 3Maloni M J, Benton W C. Supply chain partnerships:opportunities for operations research[J]. Eur JOperational Research, 1997, 101(3) :419-429.
  • 4Datar S, Jordan C, Kekre S, et al. New product development structures and time-to-market [J]. Management Science, 1997,43(4) : 452-464.
  • 5Anderson E J, Nash P. Linear programming in infinite-dimensional space [ M ]. Chichester: Wiley,1987.
  • 6Fang S C, Wu S Y. An inexact approach to solving linear semi-infinite programming problems[J]. Optimization, 1994, 28(8) :291-299.
  • 7Wang D, Fang S C. A semi-infinite programming model for earliness/tardiness production planningwith a genetic algorithm[J]. Computers and Mathematics with Applications, 1996, 31(8) :95-106.
  • 8Coop L. Loeation-alloeation problems[J]. Operations Research, 1963, 11(2) :331-343.
  • 9Hellard R B. Project partnering principle and practice[M]. London: Thomas Telford Publications, 1995.
  • 10Wang D W, Yung K L, Ip W H. A heuristic geneticalgorithm for subcontractor selection in a global manufacturing environment [J]. IEEE Trans On SMC,2001,31(2) : 189-198.

二级参考文献5

共引文献96

同被引文献62

引证文献6

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部