摘要
主要探讨横琴新区区域能源站的报建管理工作,就如何做好建筑设计方案、建设工程规划许可、施工图审查、施工许可、规划检验等报建工作进行阐述、分析、总结,并提出相应报建建议。即报建工作要具体前瞻性和准确性,这不仅需要建设单位熟悉当地报建流程,同时也需要协调各参建单位,包括施工、设计、监理、勘察单位等,只有这样才能使报建项目尽快开工建设。
It mainly discusses application for construction of regional energy stations in Hengqin New Area,expounds,analyzes and summarizes how to do well application for construction,construction project planning permission,construction drawing,construction permit,planning and inspection,and corresponding suggestions of construction management work are given. Application for construction must be specific forward-looking and accurate. This requires not only the construction unit to be familiar with the local construction process,but also the coordination of the participating units,including construction,design,supervision,and survey units. Only in this way can the construction project be constructed as soon as possible.
作者
徐为中
XU Weizhong(Zhuhai Hengqin Energy Development Co.,Ltd.,Zhuhai 519000)
出处
《福建建筑》
2019年第3期93-95,共3页
Fujian Architecture & Construction
关键词
横琴
能源站
报建管理
策略
Hengqin
Energy station
Application for construction
Strategy