摘要
竖井施工中,基岩段技术参数的确定是核心,是竖井施工质量、施工进度、施工安全和工程造价的决定性因素。
In vertical shaft construction, the technical parameters determination of the bedrock is the core, which is the decisive factor for the construction quality, construction progress, construction safety and engineering cost of the shaft.
出处
《福建冶金》
2018年第1期13-15,共3页
Fujian Metallurgy