摘要
This paper presents a new space model developed by general value engineering/value management model. The authors take the function analysis, function optimization and function realization of the development object as the basic point, to get the final optimization structure by value evaluation, so as to improve the project quality and reduce the project cost. The final case shows that the application of this model can save about 18% of the time and considerable cost of the usually planned projects under the condition of quality assurance.
This paper presents a new space model developed by general value engineering/value management model. The authors take the function analysis, function optimization and function realization of the development object as the basic point, to get the final optimization structure by value evaluation, so as to improve the project quality and reduce the project cost. The final case shows that the application of this model can save about 18% of the time and considerable cost of the usually planned projects under the condition of quality assurance.