针对路基填筑前必须根据不同的填筑材料分别进行试验段施工的特点 ,论述了试验段施工的控制方法及填土路基、填石路基、土石混填路堤的施工步骤 。
According to the characteristics of test section constructions with different filling materials the standard construction technology and parameters of roadbed construction are determined. Based on test section's construction proper construction method and mechanical combination are proposed to instruct overall construction.
出处
《山西建筑》
2002年第11期89-90,共2页
Shanxi Architecture
关键词
土石方试验段
质量控制
路基
碾压
cubic meter of earth and stone test section, quality control, roadbed, rolling