4Reusink,Jaco,Kuijpers,et al.Designing the Erasmus Bridge,Rotterdam[J].Structural Engineering International.1998(4):275-277.
5Lee T.Y.,Kim Y.H.,Kang S.W.Optimization of tensioning strategy for asymmetric cable-stayed bridge and its effect on construction process[J].Structural and Multidisciplinary Optimization,2008(35):623–629.